Upper Maple River Dam

upper Maple River dam project

This project—consisting of approximately 350,000 cubic yards of dam embankment construction which included 2,000 cubic yards of concrete spill way—was poured along with 15,000 cubic yards of ABC concrete matting. Additionally, we installed two 14'x12' RCB box culverts on the northern portion of this project.